• Eloro Resources (ELO) is pleased to provide an update on its Iska Iska silver-tin polymetallic project
  • The Iska Iska silver-tin polymetallic project is a road-accessible, royalty-free property in southern Bolivia
  • Eloro has completed 43 diamond drill holes totalling 20,030 metres (m) to test major target areas at Iska Iska
  • Three drill rigs are currently in operation at Iska Iska
  • Every hole drilled at Iska Iska to date has encountered multiple mineralized intercepts
  • Eloro Resources is an exploration and mine development company with a portfolio of gold and base-metal properties in Bolivia, Peru and Quebec
  • Eloro Resources Ltd. (ELO) opened trading at C$4.05 per share

Eloro Resources (ELO) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia.

To date, the company has completed 43 diamond drill holes totalling 20,030 metres (m) to test major target areas at Iska Iska.

To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts.

Currently, three drill rigs are in operation at Iska Iska. One surface drill rig is completing first-pass drilling of the CBP from the northern radial platform and a second surface drill is testing the major Porco (South) Target. The third drill, an underground rig, is testing the northeast part of SBBP and its mineralized envelope.

Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation.

Figure 2 is a more detailed geological plan map of the SBBP and CBP areas.

Figure 3 is a NW-SE geological section along the northwestern part of the CBP and the eastern part of SBBP showing locations of the main mineralized zone and of drill holes DSB-08, DSB-10 and DCN-2 in this release.

Figure 4 shows the currently interpreted metal zoning pattern on this same section.

Table 1 provides significant drilling results.

Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. 

Highlights:

  • Hole DSB-08, testing the northeast quadrant of the SBBP, encountered eighteen reportable mineralized intercepts beginning near surface to its terminus at 614.4 m. The longest intercept was 69.89 g Ag eq/t over 252.89m from 355.12 to 608.02m including several higher-grade sections of 196.60 g Ag eq/t including 131.13 g Ag/t over 14.52m, 134.62 g Ag eq/t including 93.25 g Ag/t over 21.08m and 145.35 g Ag eq/t including 2.38% Zn over 10.11m
  • Hole DSB-10, testing the southwest quadrant of the SBBP and northern part of the CBP, encountered twenty-nine reportable mineralized intercepts beginning near surface to its terminus at 1,019.4m. Tin was notably elevated in many intervals suggesting proximity to a mineralizing intrusive source in this area. Notable intercepts include 114.96 Ag eq/t including 0.325% tin (Sn) over 56.2m from 322.18m to 378.30m including a higher-grade section of 187.98 g Ag eq/t including 0.535% Sn over 28.86m, 80.71 g Ag eq/t including 0.213% Sn over 74.39m from 474.86 to 549.25m and 118.69 g Ag eq/t over 10.77m from 829.97 to 840.74m.

Dr. Bill Pearson, P.Geo., Eloro’s Executive Vice President Exploration, stated,

“We are continuing with our strategy of completing first pass drilling from both surface and underground to test major target areas of the SBBP, CBP and Porco (South). Targets drilled to date cover an area 2km long by 1.2km wide with additional targets further east in the caldera complex still to be tested, as shown in Figure 1. All holes drilled to date have intersected significant mineralization and it is becoming clearly evident that the Iska Iska mineralizing system is zoned both laterally and vertically. Mineralization at SBBP is more intermediate style polymetallic Ag-Zn-Pb-Sn, whereas recent results from the CBP suggest a deeper level higher temperature tin-dominant system. We are currently carrying out a down-hole induced polarization (IP) survey which will aid in determining the distribution of mineralization especially potential higher-grade areas which tend to have more sulphides.

Currently, the company has approximately 2,600 samples in the laboratory pending analysis. ALS Global in Lima, Peru has advised us that they are gradually returning their operations to a more normal basis as the COVID-19 situation improves.  The backlog of samples has now been stabilized and they anticipate that in the next 4-6 weeks the sample backlog will be significantly reduced allowing the laboratory to return to more normal turnaround times.  The preparation facility in Oruro continues to operate at normal compacity.”

Dr. Osvaldo Arce, P. Geo., General Manager of Eloro’s Bolivian subsidiary, Minera Tupiza S.R.L. and an expert on the geology of Bolivian mineral deposits said,

“Diamond drilling at Iska Iska to date allows us to define a preliminary lateral and vertical metal zoning model in this large km-scale mineralized polymetallic system. This zoning is from a higher temperature core characterized by Sn moving outward to Sn (W-Au-Bi), Sn-Ag (Bi), Ag−Zn-Pb-(Sn-Au-Cu), and finally Zn-Pb-Au. These zones are arranged according to a decrease of temperature of deposition and increasing distance from the presumed heat source that is likely a Sn porphyry at depth. Mineralization can be telescoped depending on the geochemical environment, the character of metal-forming solutions and the extent of subsequent structural overprinting and remobilization. Remobilization is likely responsible for producing significant areas of high-grade mineralization within the more extensive lower grade envelope.”

Dr. Arce continued,

“Drill hole DSB-10, drilled in the SBBP and crossing into the CBP at depth, intersected primarily tin mineralization corresponding to the highest temperature and deeper part of the mineralizing system. The tin intersections have local silver and gold values that likely belong to the edge of a higher-level epithermal event. The strong tin mineralization is widely distributed in this hole with the best intersection being 0.325% Sn over 56.2m which included a 28.86m section grading 0.535% Sn. Although not continuous a total of 211.34m cumulative intersections of Sn mineralization were obtained in the lower part of hole DSB-10 collectively grading 0.22% Sn (102.27 Ag eq/t). These higher-grade intersections have a distinctive alteration of tourmaline, silicification and jarosite within a much broader pervasive alteration of tourmaline and silicification with anomalous values of Sn. These grades of tin are comparable to grades reported for other well-known tin deposits in Bolivia including Llallagua, Huanuni and Chorolque.”

Finally, Dr. Arce noted that,

“Hole DPC-01, the first hole drilled in the Porco target zone, intersected 767 meters of an intercalation of mineralized granodiorite and intrusion breccia with aphanitic dacite and sandstone clasts which confirmed that Porco is likely a major breccia pipe. The last 72m of this hole intersected medium to coarse granodiorite which is still mineralized. Mineralization in this hole is related to breccia veins, veins and veinlets of pyrite, cassiterite, tourmaline, chalcopyrite, sphalerite, galena, pyrrhotite, siderite and alunite collectively up to 7%. Assays on this hole are pending but the potential metal contents appear to be more comparable to the higher level SBBP than the deeper level CBP. As previously reported (March 29, 2021), channel sampling of the Porco adit located approximately 200m to the south of the Porco breccia pipe target (Figure 1) returned a 50m strike length averaging 519.35 g Ag eq/t (236.13 g Ag/t, 1.89g Au/t, 0.2% Bi, 0.87% Cu, 0.31% Pb and 0.055% Sn) over an average channel width of 2.5m supporting this conclusion.”

Dr. Quinton Hennigh, Senior Technical Advisor to Eloro commented,

“Every hole drilled at Iska Iska to date has encountered multiple mineralized intercepts. Porco, the most recently tested target, is yielding visible indications of long mineralized intercepts. Even though we have now drilled numerous holes within an area 2km north-south and 1.2km east-west, we have yet to find the ultimate limits of this immense system. Every hole displays hydrothermal alteration and zones of mineralization. While it is becoming clear that mineral zonation is present within this huge system, there is still a lot of work to do to fully determine such patterns. It is entirely possible that there are multiple magmatic drivers within this immense complex. It is truly exciting to see continued discovery with every hole that is completed.”

Table 1: Significant Diamond Drilling Results, Iska Iska, as at July 5, 2021.

Note: True width of the mineralization is not known at the present time, but based on the current understanding of the relationship between drill orientation/inclination and the mineralization within the breccia pipes and the host rocks such as sandstones and dacites, it is estimated that true width ranges between 70% and 90% of the down hole interval length but this will be confirmed by further drilling. Percentage metal contents are shown for each element.

Metal prices and conversion factors used for calculation of g Ag eq/t (grams Ag per grams x metal ratio) are as follows:


Element

Price (per kg)

Ratio to Ag

Ag
$875.001.00000

Sn
$28.000.03200

Zn
$2.800.00320

Pb
$2.100.00240

Au
$57,40065.6000

Cu
$8.800.01006

Bi
$12.760.01458

In
$305.000.34857

Cd
$5.500.00629

In calculating the intersections reported in this press release a sample cutoff of 30 g Ag eq/t was used with generally a maximum dilution of 3 continuous samples below cutoff included within a mineralized section unless more dilution is justified geologically.

Table 2: Summary of Diamond Drill Holes Completed with Assays Pending and Drill Holes in Progress at Iska Iska from press release of July 6, 2021.


Hole No.

Type

Collar

Easting

Collar

Northing

Elev

Azimuth

Angle

Hole Length

m

Underground Drilling Huayra Kasa – Santa Barbara Area
DHK-18UG205421.27656358.74152.6180-10446.45
DHK-19UG205422.77656359.84151.6145-45329.80
DHK-20UG205421.27656359.24151.4180-50350.80
DHK-21UG205418.57656360.04151.9235-70512.90
DHK-22UG205418.57656360.04151.9210-60600.00

Subtotal

2,239.95
DHK-23UG205418.57656360.04151.9270-50In progress

Santa Barbara Breccia Pipe – Surface Radial Drilling from Centre
DSB-11S205118.887656205.74356.0125-40665.30

Subtotal

665.30

Central Breccia Pipe – Surface Radial Drill Program – North Setup
DCN-03S204902.07655860.04420.0135-60464.50
DCN-04S204902.07655860.04420.00-80851.40
DCN-05S204902.07655860.04420.090-60524.30
DCN-06S204902.07655860.04420.0180-80626.40

Subtotal

2,466.60
DCN-07S204902.07655860.04420.0270-60In progress

Central Breccia Pipe – Surface Radial Drill Program – South Setup
DCS-01S204852.07655612.84429.690-601,007.50
DCS-02S204852.37655612.44429.6135-60800.50
DCS-03S204852.17655612.34429.7225-60443.50

Subtotal

2251.50

Porco Central – Surface Radial Drill Program
DPC-01S205457.27655110.94175.0270-60767.50

Subtotal

767.50
DPC-02S205457.27655110.94175.0225-60In progress

TOTAL

8,390.85

S = Surface UG=Underground; collar coordinates in metres; azimuth and dip in degrees

Total drilling completed since the start of the program on September 13, 2020 is 20,030m in 43 holes (17 underground holes and 26 surface holes) with one underground and two surface holes in progress.

Drill samples are prepared in ALS Bolivia Ltda’s preparation facility in Oruro, Bolivia with pulps sent to the main ALS Global laboratory in Lima for analysis, As announced in the February 26, 2021 press release, Eloro has changed the assay protocol to utilize X-ray fluorescence (XRF) to more accurately analyze higher Sn. Tin in the CBP is suspected to occur as cassiterite which is insoluble in acid digestion, and therefore not suited for wet chemical techniques. In addition, other assay protocols have been changed to provide for a more accurate measurement of the wide-ranging suite of polymetallic metals at Iska Iska. Eloro employs an industry standard QA/QC program with standards, blanks and duplicates inserted into each batch of samples analyzed with selected check samples sent to a separate accredited laboratory.

Unfortunately, the ALS Global laboratory in Lima where the Iska Iska samples are being analyzed has had major delays in turnaround time due to the impact of the COVID-19 lockdown of Lima by the Peruvian government. This has restricted the availability of critical supplies necessary to carry out analytical work. As a result, there will be delays in reporting assay results.

About Iska Iska

The Iska Iska silver-tin polymetallic project is a road-accessible, royalty-free property, wholly controlled by the Title Holder, Empresa Minera Villegas S.R.L. The project is located 48 km north of Tupiza city, in the Sud Chichas Province of the Department of Potosi in southern Bolivia.

Eloro has an option to earn a 99% interest in Iska Iska.

Eloro began underground diamond drilling from the Huayra Kasa underground workings at Iska Iska on September 13, 2020. On November 18, 2020, Eloro announced the discovery of a significant breccia pipe with extensive silver polymetallic mineralization just east of the Huayra Kasa underground workings and a high-grade gold-bismuth zone in the underground workings. On November 24, 2020, Eloro announced the discovery of the Santa Barbara Breccia Pipe (“SBBP”) approximately 150m southwest of the Huayra Kasa underground workings.

On January 26, 2021, Eloro announced significant results from the first drilling at the SBBP including the discovery hole DHK-15 which returned 129.60 g Ag eq/t over 257.5m (29.53g Ag/t, 0.078g Au/t, 1.45%Zn, 0.59%Pb, 0.080%Cu, 0.056%Sn, 0.0022%In and 0.0064% Bi from 0.0m to 257.5m. Subsequent drilling has confirmed significant values of Ag-Sn polymetallic mineralization in the SBBP and the adjacent Central Breccia Pipe (“CBP”). The SBBP thus far extends 800m along strike by 400+m wide and extends to at least 700m depth. CBP extends for 700m along strike by 400+m wide and extends to at least 900m deep.

A substantive mineralized envelope that is open along strike and down-dip extends around the breccia pipes. Continuous channel sampling of the Santa Barbara Adit located to the east of SBBP returned 442 g Ag eq/t (164.96 gAg/t, 0.46%Sn, 3.46% Pb and 0.14% Cu) over 166m including 1,092 g Ag eq/t (446 g Ag/t, 9.03% Pb and 1.16% Sn) over 56.19m. The west end of the adit intersects the end of the SBBP.

On May 4, 2021, Eloro released results from the first drill hole on the CBP. Hole DCN-01 intersected multiple mineralized intercepts including 196.09 g Ag eq/t (150.25 g Ag/t, 0.10% Sn and 0.05 g Au/t) over 56.2m and containing 342.98 g Ag eq/t (274.0 g Ag/t, 0.16% Sn and 0.16 g Au/t) over 27.53m. Hole DSB-10, drilled from Santa Barbara Breccia Pipe platform, encountered over 500m of continuous sulphide mineralization in a position several hundred metres below mineralization encountered in hole DCN-01. Assays are pending. The target zone is more than 1km long by 800m wide, over 500m thick and open in all directions.

Geological mapping and satellite interpretation have located a third major breccia pipe target Porco (South) which is approximately 600m in diameter (South) located southeast of CBP in the southern part of the Iska Iska caldera complex. Previous channel sampling in the Porco adit located adjacent to the target area 200m to the southeast returned 50m grading 519.35 g Ag eq/t including 236.13 g Ag/t, 1.89 g Au/t, 0.87% Cu, 0.22% Bi and >0.05% Sn over an average sample width of 2.49m.

Currently, three diamond drill rigs are active at Iska Iska, two surface rigs and one underground drill. Planned drilling for 2021 is 51,000m with the aim of outlining an initial inferred NI 43-101 mineralization by late fall. A ground magnetic survey was recently completed over the property and an induced polarization survey will commence shortly to further define drill targets. Preliminary metallurgical tests are also in progress. An updated NI 43-101 Technical Report is being prepared by independent consultant Micon International Ltd.

Eloro Resources is an exploration and mine development company with a portfolio of gold and base-metal properties in Bolivia, Peru and Quebec.

Eloro Resources Ltd. (ELO) opened trading at C$4.05 per share.

Figure 1: Geology of the Iska Iska Caldera Complex showing locations of Major Breccia Pipe targets and diamond drill holes.
Figure 2: Detailed Geological Plan Map of the Santa Barbara and Central Breccia Pipe areas showing locations of diamond drill holes.
Figure 3: SW-NE Geological Cross Section of the Central Breccia Pipe and Santa Barbara Breccia Pipe, Iska Iska Project
Figure 4: SW-NE Geological Cross Section showing Metal Zonation of the Central Breccia Pipe and Santa Barbara Breccia Pipe, Iska Iska Project
More From The Market Online

Adyton to recommence work at its Feni Island Project

Adyton Resources (TSXV:ADY) gears up to restart work activities at its Feni Island Gold-Copper Project in Papua New Guinea.

This company starts production at what could be Canada’s next great gold mine 

IAMGOLD (TSX:IMG) is a Canadian-based intermediate gold producer and developer focused on mining properties in North America and West Africa.

Teck misses Q1 profit estimates on lower steelmaking coal sales

Canadian mining stock Teck Resources Ltd. (TSX:TECK.A and TECK.B; NYSE:TECK) misses Q1 profit estimates on Thursday.
The Market Online Video

Exploration company provides project portfolio update

Banyan Gold Corp. (TSXV:BYN) is focused on exploration and advancing and de-risking its AurMac Gold Project in the Yukon.